References: Energy
The complete list of completed projects is available in the menu Projects
Laser welding of battery contacts
Saft Ferak a.s., Czech Republic, 2024 - 2025
Programming | Simatic, TIA Portal
: Laser welding of contacts for various battery types
: Application software Simatic S7-1500, WinCC RT
Bukoza Energo - service activity
Bukoza Energo, Hencovce, Slovakia, 2023
Programming | Simatic, TIA Portal
: Service activities for TG1 and TG3 turbines
: Application software Simatic S7-300, WinCC Comfort Panel
Bioelectric power plant - external steam distribution
Energy Edge, Žarnovica, Slovakia, 2022
Programming | TIA Portal
: Control of additional steam distribution
: Application software Simatic S7-300, WinCC RT Panel
Bioelectric power plant - visualisation replacement
Energy Edge, Žarnovica, Slovakia, 2022
Programming | TIA Portal
: Replacement of the visualisation with WinCC RT
: Application software WinCC RT Advanced
Bukoza Energo - service activity
Bukoza Energo, Hencovce, Slovakia, 2021
Programming | Simatic, TIA Portal
: Service activities for TG1 and TG3 turbines
: Application software Simatic S7-300, WinCC Comfort Panel
Bioelectric power plant - boiler repair
Energy Edge, Žarnovica, Slovakia, 2020
Programming | Simatic
: Line software modification (PLC, visualisation)
: Application software Simatic S7-400, visualisation InTouch SP
Operator station upgrade on TG3
Bukoza Energo, Slovakia, 2018
Programming | Simatic, TIA Portal
: HW+SW upgrade of the WinCC RT operator station (SCADA) from 6.2 to 7.4
: WinCC Scada 7.4
Bioelectric power plant - boiler software modifications
Energy Edge, Žarnovica, Slovakia, 2018 - 2019
Programming | Simatic, InTouch
: Boiler software modification - PLC S7-400
: Application software Simatic S7-400, visualisation InTouch SP
JIH gas mixing station
Energertika Třinec a.s., Czech Republic, 2017
Programming | Simatic
: Mixing station for blast-furnace, coke-oven and converter gas
: Application software 4x S7-300
: Commissioning and start-up
TG3 overhaul
Bukoza Energo, Hencovce, Slovakia, 2017
Programming | Simatic, WinCC (Scada)
: Control system for regulation and protection of equipment in the TG3 turbine hall
: Visualisation in the DCS system
: Application software Simatic S7-300, WinCC
: Communication with ABB (IEC 61850)
: Commissioning and start-up
Migration of local turbine visualisation to the control room
Biocel Paskov, Czech Republic, 2016
Programming | Simatic, WinCC
: Migration of MP377 operator panel to WinCC Flexible RT2008
Primary power control - certification tests
Bukoza Energo, Hencovce, Slovakia, 2016
Programming | Simatic, WinCC (Scada)
: Preparation and execution of primary power control certification tests
: Application software Simatic S7-300, WinCC
Cooling towers
Bukoza Energo, Hencovce, Slovakia, 2016
Programming | Simatic, WinCC (Scada)
: Control system for cooling towers of the TG3 turbine condensing circuits
: Application software Simatic S7-300, WinCC
Turbogenerator protection control
Mondi Group, Ružomberok, Slovakia, 2016
Programming | Simatic, WinCC
: TG2 turbogenerator protection
: Application software Simatic S7-300, WinCC
: Communication with DCS via Modbus RTU
: Commissioning and start-up
Boiler burner automation
Alpiq Zlín, Czech Republic, 2015
Programming | Simatic
: Migration of K21 boiler burner control to a new PLC
: Application software Simatic S7-300
TG1 start-up after overhaul
Bukoza Energo, Hencovce, Slovakia, 2015
Supervision | Simatic, WinCC (Scada)
: Commissioning and start-up of the turbogenerator after overhaul
Heat accumulator
Agras Želatovice, Czech Republic, 2015
Programming | Simatic, InTouch
: Use of flue-gas heat for storage in an oil medium
: Application software Simatic S7-300, InTouch
Back-pressure turbine
TG Hajnówka, Poland, 2012 - 2013
Programming | Simatic, WinCC
: Back-pressure turbine, turbine commissioning
: PLC Simatic S7300
: Visualisation WinCC
6 MW turbogenerator control - regulation and protection
TG Nadia Chekka, Lebanon, 2012 - 2013
Programming | Simatic, WinCC (Scada)
: 6 MW turbogenerator (back-pressure turbine, upgrade and commissioning)
: PLC Simatic S7400
: Visualisation WinCC
Bioelectric power plant
Energy Edge, Žarnovica, Slovakia, 2011 - 2014
Programming | Simatic, Wonderware
: Application software for PLC Simatic S7-400 - boiler
: Application software for PLC Simatic S7-300 - transport
: Application software for PLC Simatic S7-300 - heat pumps
: Wonderware System Platform (InTouch, WHS, WIS) for boiler, turbine and transport
TG1 - turbogenerator control - regulation and protection
Bukoza Energo, Hencovce, Slovakia, 2011
Programming | Simatic, WinCC (Scada)
: TG1 turbogenerator - upgrade (software development and commissioning)
: 2x PLC Simatic S7300
: Visualisation WinCC
TG3 - turbogenerator control - regulation and protection
Bukoza Energo, Hencovce, Slovakia, 2008
Programming | Simatic, WinCC (Scada)
: Turbogenerator - upgrade (software development and commissioning)
: 1x Simatic S7400
: Visualisation WinCC
: Industrial Ethernet
30 MW turbogenerator control - regulation and protection
Cukrovar Broadwater, Australia, 2008
Programming | Simatic, WinCC (Scada)
: 30 MW condensing turbine
: Turbine protection system (S7-400)
: Turbine control system (S7-400)
: WinCC visualisation
: Synchronisation with generator connection points
30 MW turbogenerator control - regulation and protection
Cukrovar Condong, Australia, 2007
Programming | Simatic, WinCC (Scada)
: 30 MW condensing turbine
: Turbine protection system (S7-400)
: Turbine control system (S7-400)
: WinCC visualisation
: Synchronisation with generator connection points
Turbogenerator protection - 36.2 MW condensing turbine
Papírny YFY GROUP, Yangzhou, China, 2007
Programming | Simatic, WinCC (Scada)
: Turbine protection system (S7-400)
: Turbine control system (S7-400)
: WinCC visualisation
: Synchronisation with generator connection points
: Modbus communication with the HV system
Parallel operation of two 8.2 MW turbogenerators
Cukrovar Kayseri, závod Bogazliyan, Turkey, 2007
Commissioning | Simatic
: 2 back-pressure turbines, 8.2 MW, in parallel operation
: Supervision during sugar beet campaign start-up
Parallel operation of two 8.2 MW turbogenerators
Cukrovar Kayseri, závod Bogazliyan, Turkey, 2006 - 2007
Programming | Simatic, WinCC (Scada)
: Back-pressure turbines 8.2 MW (2 units)
: Turbine protection system (S7-400H)
: Turbine control system (S7-400H)
: Synchronisation with generator connection points
: WinCC visualisation (2 stations)
50 MW condensing turbine
Papírny Štětí, Czech Republic, 2006
Commissioning | Simatic
: Participation in commissioning of the turbine protection system (Simatic S7-400)
Pellet combustion
Škoda Auto, Mladá Boleslav, Czech Republic, 2006
Programming | Simatic, TP170
: Application software for Simatic S7-300
: WinCC visualisation on TP170 Touch Panel
Fuel storage yard spraying system
Dalkia Krnov, Czech Republic, 2006
Programming | Simatic, TP170
: Application software for Simatic S7-300 - storage yard spraying
: Visualisation and control via TP170 Touch Panel
Pre-complex and complex tests - Temelin NPP Unit 2
Škoda Praha, Czech Republic, 2001 - 2003
Commissioning | Westinghouse
: Technical assistance during pre-complex and complex testing of Unit 2
: Support during power start-up tests
: Cooperation with UNIS s.r.o., Brno and Skoda Praha a.s.
Pre-complex and complex tests - Temelin NPP Unit 1
Škoda Praha, Czech Republic, 2000 - 2003
Commissioning | Westinghouse
: Technical assistance during pre-complex and complex testing of Unit 1
: Support during power start-up tests
: Cooperation with UNIS s.r.o., Brno and Skoda Praha a.s.
Gas energy dispatch centre
Energetika Třinec, Czech Republic, 1996
Programming | InTouch, Simatic
: InTouch visualisation of the gas dispatch centre and migration of converter-gas processing control systems (gas holder, booster station, mixing stations) to this visualisation - S5 135 U (3964R protocol)
Natural gas regulating station
Energetika Třinec, Czech Republic, 1994
Programming | Simatic
: SIMATIC S5 95 U-based control system connected to the SINEC L1 communication network
: Control system delivery, cooperation with REMER s.r.o. Třinec, turnkey delivery for PLYNOSTAV Pardubice
Chemical water treatment plant - water neutralisation
Energetika Třinec, Czech Republic, 1994
Programming | Simatic, Promotic
: Industrial PC-based system with MESIT I/O, using PROMOTIC control and visualisation software by MICROSYS s.r.o., Ostrava
: Cooperation with TV - ASRTP Třinecké železárny, a.s., Třinec
Chemical water treatment plant - horizontal sand filters
Energetika Třinec, Czech Republic, 1994
Programming | Simatic, Promotic
: Industrial PC-based system with MESIT I/O, using PROMOTIC control and visualisation software by MICROSYS s.r.o., Ostrava
: Cooperation with TV - ASRTP Třinecké železárny, a.s., Třinec
Heat exchanger station
Město Český Těšín, Czech Republic, 1994
Programming | Simatic
: SIMATIC S5 95 U-based heat exchanger station control system
: Control system delivery, cooperation with REMER s.r.o. Třinec (I&C delivery)
Automation of HV and LV substations
Energetika Třinec, Czech Republic, 1993 - 1994
Programming | Simatic, Promotic
: System based on 5x SIMATIC S5 135 U in SINEC H1, SINEC L1 and 3964R networks; PROMOTIC visualisation by Microsys Ostrava